Technical Article

Annual Trials Are Not the Same as FMEA Proving Trials

Published: 2026-09-22 5 min read Reference: IMCA M166 & IMCA M190 Rev. 3 & IMO MSC.1/Circ.1580
Key Takeaways
  • DP FMEA is the theoretical analysis and full verification of redundancy boundaries at the design stage and across the life cycle, whereas annual trials are the yearly check of the operating condition of the control functions already in place.
  • Common misconception 1: assuming that because annual trials are done, the FMEA need not be revised and reissued (after a major conversion the FMEA must be updated).
  • Common misconception 2: assuming that routine engine-room maintenance can substitute for destructive single-failure simulation testing.
  • Common misconception 3: assuming that holding a certificate means charterers will not look into how the FMEA and the proving trials programme correspond.

In day-to-day technical enquiries we are often asked by owners or superintendents: “Since we run DP annual trials every year, why do the class society at special survey — or the charterer on acceptance — still insist on the latest FMEA report and proving trial records?” The answer is that the two are fundamentally different in engineering nature, depth of testing and reference documents.

Difference 1: Purpose and Technical Depth

  • DP FMEA (Failure Modes and Effects Analysis) and proving trials: the purpose is to exhaustively identify and verify, from the system architecture upwards, that “no single failure will cause loss of position” (WCFDI). They cover extreme conditions such as main switchboard section breaking, network storm injection and sensor cross-interference, and are the “underlying constitution” of the vessel's redundancy.
  • DP annual trials: working within the framework already established by the FMEA, they are the routine verification of the system's operating health over the past year — relay action reliability, thruster response linearity — confirming that equipment has not degraded or failed through age.

Misconception 1: “We changed some equipment — isn't testing it at the annual survey enough?”

No. If the vessel has had a new generator set installed, a variable frequency drive type changed, or a major control software version upgrade, the single-failure boundary established in the original FMEA has moved. The FMEA report must be reviewed, revised and reissued, and dedicated FMEA proving trials carried out again. Annual trials alone cannot substitute for an FMEA reissue.

Misconception 2: “The equipment is well maintained — why keep tripping breakers at sea?”

Routine maintenance guarantees that equipment “starts up normally”, but it does not prove that “when a sudden trip occurs, the standby set can take over seamlessly within the permitted seconds”. Verifying that protection actions, load shedding and automatic speed control respond as intended is precisely the core of FMEA proving trials — and precisely where the value of having a surveyor witness on board lies.

Prepared by the technical team of An Lai Ship Management (Shenzhen) Co., Ltd. for reference and discussion with owners, superintendents and masters.

For programme preparation or technical assessment on a specific vessel, please contact: marine@anlaiship.com