Services & Technical Solutions

Our Professional Service System

We hold to two principles: “the analyst is the one who boards” and “we find the problem and fix it”. Reports are issued in English to internationally recognised standards, with full version control and three-way sign-off throughout.

Service Line DetailDynamic Positioning Verification & Trials

DP Verification & Trials

DP vessels must periodically demonstrate, to the applicable standard, that they can hold position following a single failure. We prepare the trials programme against the vessel's actual configuration, send a surveyor on board to witness every trial item, and issue the report in English for class annual survey, charterer vetting and owner acceptance.

Technical Approach & On-Site Control

The dynamic positioning (DP) system is central to the operating safety of construction vessels, wind turbine installation vessels and other specialist offshore tonnage. Working from the vessel's drawings and its actual configuration, we analyse the single-failure boundary in depth (Worst Case Failure Design Intent — WCFDI) and write a bespoke trials programme that satisfies class and recognised industry guidance. Our surveyor attends throughout to witness fault-simulation trials on thrusters, switchboard bus sections, generator tripping, control sensors and network buses, and issues an objective, rigorous, version-controlled report in English.

Scope of Services

  • DP Annual Trials
  • DP Five-Yearly Trials (special survey)
  • DP FMEA & Proving Trials, including review, revision and reissue of the existing FMEA
  • DP Audit & Gap Analysis
DP verification on the bridge

Deliverables & Workflow

Unified numbering, version control and closed-loop retention across the whole file

01. Trials Programme (EN)

Prepared to class and IMCA guidance and technically reviewed before attendance

02. Trial Result Letter

Issued by the surveyor on the day of trials and countersigned by the master

03. Full English Report

Item-by-item records, measured traces / photographs, findings list and conclusions

04. Timesheet & Completion Note

Attendance period and on-site trial items confirmed, sealed and retained by both parties

05. Findings Close-Out

A/B/C graded remediation ledger, tracked through to closure with evidence retained

Applicable Standards & Guidance

Executed strictly in accordance with recognised international bodies and classification technical circulars

IMO MSC.1/Circ.1580 — Guidelines for Vessels and Units with Dynamic Positioning Systems
IMCA M190 Rev. 3 — Guidance on Annual DP Trials and Re-verification
IMCA M103 — Design and Guidance for Offshore DP Operations
IMCA M166 — Guidance on DP FMEA Proving Trials
IMCA M117 — DP Crew Training and Competence Criteria
China Classification Society (CCS) — Rules for Classification of Mobile Offshore Units and Special Service Vessels

Project Experience Record

Objective record · factual reporting

Presented accurately by vessel type, scope and year; owner confidentiality is strictly observed

DP2 Construction Vessel 1 vessel
DP Annual Trials
2026
DP2 Wind Turbine Installation Vessel 2 vessels
DP FMEA & Proving Trials
2026
DP1 Wind Turbine Installation Vessel 1 vessel
DP Annual Trials
2026