Keep Your DP System Ready for Class, Charterers and Owners
DP verification and FMEA proving trials · Ship technical management and crew manning · DP and marine electrical repair. English reports issued to IMO MSC.1/Circ.1580 and the IMCA guidance series, ready for class survey, charterer vetting and owner acceptance.
Compliance Framework
IMO · IMCA · CCS
Report Delivery
English · 3-Way Sign-Off
Team Experience
10 Years Avg.
Attendance Model
Nationwide Coastal
Our Core Service Lines
DP Verification & Trials
Annual trials, five-yearly special surveys, FMEA and proving trials, DP audits. We attend on board to witness every test and issue the report in English.
Ship Management & Crew Manning
Technical ship management, certificate and maintenance tracking, crew selection and competency verification.
DP & Marine Electrical Repair
Fault diagnosis and repair of DP, propulsion, steering and power distribution systems, including close-out of survey findings.
Why Work With Us
No layered subcontracting and no box-ticking — professional, practical and compliant, safeguarding safety at sea.
The Analyst Is the One Who Boards
Shore-based analysis and on-board trials are delivered by the same team — no subcontracting, no handovers. By removing the gap between those who write the programme and those who run it, every item in the trials programme is closed out precisely on board.
We Find the Problem and Fix It
We can take on the remediation for the findings we raise — not just hand you a list. From sensor calibration and loop tracing to drive and control interface repair, we have the engineering capability to close the loop on site.
English Reports to International Standards
Consistent formatting, complete data, full test records and photographs — directly usable for class survey, charterer vetting and owner acceptance, removing language and technical-standard barriers.
Lean Team, Fast Response
We can accommodate late changes to the vessel schedule without layers of booking. Based in Shenzhen, we coordinate quickly with coastal ports and operating areas nationwide to deliver prompt surveyor attendance and engineering support.
Three-Way Sign-Off · Findings Closed Out · Full Version Control
Every report is signed separately by the preparer, reviewer and approver. The reviewer and approver do not attend the vessel, which safeguards independence and authority. Survey findings are managed in three tiers — A, B and C — and tracked through to closure, so we never simply list problems and walk away.
Latest Standards & Technical Notes
How the DP Annual Trials Window Is Calculated
Under IMO MSC.1/Circ.1580 and IMCA M190, DP annual trials must be completed within three months either side of the certificate anniversary date. This article explains the window logic, charterer acceptance overlaps and the remedy path for overdue trials.
Annual Trials Are Not the Same as FMEA Proving Trials
The two differ fundamentally in purpose, scope, reference documents and deliverables. We take the three misconceptions most common among owners and superintendents and address them one by one, clarifying the technical boundary and the compliance requirements.
What the A, B and C Finding Categories Actually Mean
The IMCA framework divides DP survey findings strictly into three tiers: A, B and C. We set out the basis for each category, the close-out deadlines and the chain of evidence the owner must retain.