An Lai Ship Management (Shenzhen) Co., Ltd. Dynamic Positioning (DP) Specialist Services

Keep Your DP System Ready for Class, Charterers and Owners

DP verification and FMEA proving trials · Ship technical management and crew manning · DP and marine electrical repair. English reports issued to IMO MSC.1/Circ.1580 and the IMCA guidance series, ready for class survey, charterer vetting and owner acceptance.

Compliance Framework

IMO · IMCA · CCS

Report Delivery

English · 3-Way Sign-Off

Team Experience

10 Years Avg.

Attendance Model

Nationwide Coastal

DP2 offshore construction vessel during sea trials
Every trial item witnessed on board
Worst Case Failure Design Intent (WCFDI) verification and closed-loop remediation
How we work
Core Capabilities

Our Core Service Lines

See all programmes and standards
Why Choose An Lai

Why Work With Us

No layered subcontracting and no box-ticking — professional, practical and compliant, safeguarding safety at sea.

01

The Analyst Is the One Who Boards

Shore-based analysis and on-board trials are delivered by the same team — no subcontracting, no handovers. By removing the gap between those who write the programme and those who run it, every item in the trials programme is closed out precisely on board.

Direct Execution by Analysts
02

We Find the Problem and Fix It

We can take on the remediation for the findings we raise — not just hand you a list. From sensor calibration and loop tracing to drive and control interface repair, we have the engineering capability to close the loop on site.

End-to-End Remediation
03

English Reports to International Standards

Consistent formatting, complete data, full test records and photographs — directly usable for class survey, charterer vetting and owner acceptance, removing language and technical-standard barriers.

International English Reporting
04

Lean Team, Fast Response

We can accommodate late changes to the vessel schedule without layers of booking. Based in Shenzhen, we coordinate quickly with coastal ports and operating areas nationwide to deliver prompt surveyor attendance and engineering support.

Agile & Prompt Response
Quality Control & Reporting Independence

Three-Way Sign-Off · Findings Closed Out · Full Version Control

Every report is signed separately by the preparer, reviewer and approver. The reviewer and approver do not attend the vessel, which safeguards independence and authority. Survey findings are managed in three tiers — A, B and C — and tracked through to closure, so we never simply list problems and walk away.

Technical Insights

Latest Standards & Technical Notes

View all articles